Butuh Training?

Silakan ketik kebutuhan training Anda di sini. Ada lebih 14.000 topik dan 250.000 event sepanjang tahun 2024

COAL PULVERIZER MAINTENANCE AND PERFORMANCE – Half Confirmed

ACARA

05 – 07 September 2017 | Rp 7.000.000,- di Hotel Horison Ultima Riss, Yogyakarta

 

DESCRIPTION COAL PULVERIZER MAINTENANCE AND PERFORMANCE

This training is designed to benefit personnel responsible for maintaining the performance, reliability, and availability of their power plants coal pulverizers.

This course addresses preventive and corrective maintenance to optimize equipment performance, and recommends procedures and practice before, during, and after mill maintenance overhouls.

The training will enhance the knowledge of the participants to better :

  1. Indentify critical inspection points and conduct inspections
  2. Execute routine maintenance and adjustments
  3. Differentiate typical from abnormal wear
  4. Increase reliability and availability
  5. Optimize grinding capacity and efficinecy

OUTLINE COAL PULVERIZER MAINTENANCE AND PERFORMANCE

  1. Coal pulverization fundamentals
  2. Maintenance summary of the mill’s major components
  3. Maintenance summary of key auxiliary systems
  4. General liner and wear protection
  5. Spare parts and critical service support options
  6. Fastener application guidelines
  7. General overview of installation and disassembly of such systems as the journals, springs, classifiers, exhauster fans, bowl liners, vane whell, and gearing
  8. Performance testing and adjustment for coal milling systems
    • Air flow measurements and control
    • Air to coal flow optimization
    • Coal grinding and finesses efficiency issues
  9. Pulverizer fire prevention and post event inspection
  10. Troubleshooting

PARTICIPANT COAL PULVERIZER MAINTENANCE AND PERFORMANCE

  • Maintenance personnel
  • Maintenance planning personnel
  • Engineering personnel

INSTRUCTURE COAL PULVERIZER MAINTENANCE AND PERFORMANCE

Ir.  Yohanes Agus Jayatun , M.T and Tim

METODHE COAL PULVERIZER MAINTENANCE AND PERFORMANCE

Kegiatan pelatihan dirancang agar peserta dapat memahami secara komprehensif materi yang disampaikan, sehingga dapat dimplementasikan secara aplikatif dalam dunia kerja. Adapun metode yang digunakan adalah:

  1. Presentation
  2. Discuss
  3. Case Study
  4. Evaluation

TIME & PLACE COAL PULVERIZER MAINTENANCE AND PERFORMANCE

  • 5 – 7 September 2017
  • Pukul 08.30 – 16.00 WIB

Hotel Horison Ultima Riss Yogyakarta

Request for Training Venue: Semarang, Solo, Bandung, Jakarta, Balikpapan, Surabaya, Jogja, Lombok, Malang, Makassar and Batam

In House Training Depend on request

INVESTATION COAL PULVERIZER MAINTENANCE AND PERFORMANCE

  • Course Fee : Rp. 7.000.000,-/participant (non residential)
  • Special Price : Rp. 6.500.000,-/participant (non residential) Min. 2 Peserta dari Perusahaan yang sama

FACILITY COAL PULVERIZER MAINTENANCE AND PERFORMANCE

  1. Training Hand Out
  2. Digital Material
  3. Certificate
  4. Exclusive Souvenir
  5. Qualified Bag
  6. Training Photo
  7. Training room with full AC facilities and multimedia
  8. Once lunch and twice coffee break every day of training
  9. Qualified Instructor

 

COAL PULVERIZER MAINTENANCE AND PERFORMANCE

 

Formulir Pra-Pendaftaran Public Training / Permintaan Informasi Lebih Lanjut
  1. JENIS INFORMASI/TRAINING
  2. (required)
  3. (required)
  4. DATA PRIBADI
  5. (required)
  6. (required)
  7. (required)
  8. (valid email required)
  9. (required)
  10. (required)
  11. DATA PRE REGISTRATION (Tidak Mengikat)
  12. (required)
  13. PESAN UNTUK PENYELENGGARA TRAINING
  14. Captcha
 

cforms contact form by delicious:days

Tags:  , , , , , , ,