Butuh Training?

Silakan ketik kebutuhan training Anda di sini. Ada lebih 14.000 topik dan 250.000 event sepanjang tahun 2024

DESIGN AND MAINTENANCE : GAS, OIL AND WATER PIPELINE

ACARA

04 – 07 Februari 2020 | Rp 8.950.000/ peserta di Bandung
16 – 19 Maret 2020 | Rp 8.950.000/ peserta di Bandung
31 Maret – 03 April 2020 | Rp 8.950.000/ peserta di Bandung

Jadwal Training 2020 Selanjutnya …

 

 

DESIGN AND MAINTENANCE : GAS, OIL AND WATER PIPELINE  INTRODUCTION :

To fulfill the oil and gas demand for power generation, recovery processes, and other uses, pipelines are utilized to transport the supply from their source.  These pipelines are mostly buried and operate without disturbing normal pursuits.

Construction procedures for most pipeline systems can be adapted to consider specific environmental conditions and are tailored to cause minimal impact on the environment.

Unattended pumping stations move large volumes of oil and petroleum products under high pressure.  Many factors have to be considered in the engineering and design of long-distance pipelines, including the nature and volume of fluid to be transported, the length of pipeline, the types of terrain traversed and the environmental constraints.  Major factor influencing pipeline system design are: Fluid properties, design condition, supply and demand magnitude/location, Code and standards, Route, topography and access, environmental impact, economic, hydrological impact, seismic and volcanic impacts.

To obtain optimum results for a pipeline transmission system, complex economic and engineering studies are necessary to decide on the pipeline diameter, material, compression/pumping power requirements and location of the pipeline route.

 

DESIGN AND MAINTENANCE : GAS, OIL AND WATER PIPELINE TRAINING MATERIAL OUTLINE

  1. Overview of Problems in Gas, Oil and Produced Water Pipeline Operations and Maintenance
  2. The Pipeline Design Approach and Considerations
  3. Design of Gas Transmission Pipeline
  4. Design of Crude, Oil and Produced Water Transportation Pipeline
  5. Valves, Flanges and Fittings Selection for Crude, Oil, Gas and Produced Water Pipeline Design

 

INSTRUCTOR :   Ir. Hilman Ahmad,DCE. and Associates

 

VENUE :   Bandung (Golden Flower, Banana Inn, Serela, Gino Feruci), Amaroossa Hotel, Noor Hotel, Grand Setiabudi Hotel, dll

 

TRAINING DURATION :   4 days

 

JADWAL TRAINING 2020

  1. 04 Feb 2020-07 Feb 2020
  2. 16 Mar 2020-19 Mar 2020
  3. 31 Mar 2020-03 Apr 2020
  4. 05 Mei 2020-08 Mei 2020
  5. 02 Jun 2020-05 Jun 2020
  6. 30 Jun 2020-03 Jul 2020
  7. 04 Agust 2020-07 Agust 2020
  8. 01 Sep 2020-04 Sep 2020
  9. 06 Okt 2020-09 Okt 2020
  10. 03 Nop 2020-06 Nop 2020
  11. 01 Des 2020-04 Des 2020

 

INVESTMENT PRICE/PERSON :

  1. Rp 8.950.000/person (full fare) or
  2. Rp 8.750.000/person (early bird, payment 1 week before training) or
  3. Rp 8.500.000/person (if there are 3 or more participants from the same company)

 

FACILITIES FOR PARTICIPANTS :

  1. Training Module
  2. Flash Disk contains training material
  3. Certificate
  4. Stationeries: NoteBook and Ballpoint
  5. T-Shirt
  6. Backpack
  7. Training Photo
  8. Training room with full AC facilities and multimedia
  9. Lunch and twice coffeebreak everyday of training
  10. Qualified instructor
  11. Transportation for participants from hotel of participants to/from hotel of training (if minimal number of participants from one company is 4 persons)

 

GAS, OIL AND WATER PIPELINE DESIGN AND MAINTENANCE

Formulir Pra-Pendaftaran Public Training / Permintaan Informasi Lebih Lanjut
  1. JENIS INFORMASI/TRAINING
  2. (required)
  3. (required)
  4. DATA PRIBADI
  5. (required)
  6. (required)
  7. (required)
  8. (valid email required)
  9. (required)
  10. (required)
  11. DATA PRE REGISTRATION (Tidak Mengikat)
  12. (required)
  13. PESAN UNTUK PENYELENGGARA TRAINING
  14. Captcha
 

cforms contact form by delicious:days

Tags:  , , , , , , , ,