Drilling Operation for Nondrilling Personnel
EVENT
03 – 04 Februari 2014 | Rp 8.500.000/person di Yogyakarta
03 – 04 Maret 2014 | Rp 8.500.000/person di Yogyakarta
07 – 08 April 2014 | Rp 8.500.000/person di Yogyakarta
05 – 06 Mei 2014 | Rp 8.500.000/person di Yogyakarta
TRAINING OBJECTIVES Drilling Operation for Nondrilling Personnel
After following this courses participant of courses expected can:
- Comprehending work scope in drilling operation
- Comprehending phases planning of well
- Comprehending the understanding of formation pressure and bearing of with planning of drilling
- Comprehending components of rig
- Comprehending drilling material types ( mud, cement and casing) and also his function
- Comprehending drilling directional
- Comprehending the drilling problem-problem and hand of
COURSE CONTENT Drilling Operation for Nondrilling Personnel
Well Planning
- Well Planning
- Classification Type Well
- Formation Pressure
- Cost Estimate
- Well Planning Process
Preparation Of Drilling Operation
- Introduction
- Preparation of Area
- Transportation
- Direction of worker
- Building Rig
- Support & Installation Equipment
- Final Preparation
Formation Pressure & Frac Gradient
- Introduction
- Normal Pressure
- Abnormal Pressure
- Drilling Problem Related to Pressure Formation
- Zone Transition
- Abnormal Pressure Detection
- Fract Gradient Formation
Component Of Rig
- Power System
- Hoisting System
- Circulating System
- Rotating System
- Well Control
- Well Monitoring
Drillstring Design
- Calculation of Drillstring Design
Drilling Fluid
- Introduction
- Drilling Fluid Function
- Characteristic of Drilling Fluid
- Hydrations Bentonite
- Type of Drilling Fluid
Casing Setting Depth
- Type Casing & Tubing
- Setting Depth Casing Problem
Casing Design
- Function of Casing
- Classification of Casing
- Weight on Casing
- Calculation of Casing Design
Cementing
- Function of Cement
- Composition of Cement
- Classification of Cement
- Characteristic of Cement
- Additive of Cement
Directional Drilling
- Type of Directional Drilling
- Simple Build Curve
- Monitoring of Drilling Path
Hole Problems
- Pipe Stuck
- Sloughing Shale
- Lost Circulation
Well Control
- Well Control
- Primary Control
- Kick
- Secondary Control
- Well Killing
- BOP
WHO SHOULD ATTEND
Managers, Bankers, Secretaries, Accountants, Lawyers, Purchasing Agents, Businessmen, Owners of Oil Properties, Oilfield Suppliers and Salesmen, Administration personnel and supportive and Industry personnel
Training Instructor Drilling Operation for Nondrilling Personnel Ir. Boedi Windiarto
Ir. Boedi Windiarto has graduated from bachelor degree of petroleum engineering. To share his knowledge with other people, he leads in training and courses at several topics, such as: Gas Lift Operation for Optimize Production, Basic Drilling Engineering for Operation, Well Completion & Work over, Basic Reservoir and Drilling Engineering
Mr. Boedi is a team leader for a group of Schlumberger Engineers outsourcing. He was supporting production and reservoir for Marginal Field Wonocolo Pertamina Cepu.
VENUE :
Yogyakarta (Jogjakarta plaza hotel/Ibis hotel yogyakarta/Ibis Styles yogyakarta hotel/Mutiara hotel/ Melia Purosani hotel)
TRAINING DURATION :
4 days
TRAINING TIME :
- 6 – 9 January 2014
- 3 – 6 February 2014
- 3 – 6 March 2014
- 7 – 10 April 2014
- 5 – 8 May 2014
- 2 – 5 June 2014
- 7 – 10 July 2014
- 18 – 21 August 2014
- 8 – 11 September 2014
- 13 – 16 October 2014
- 3 – 6 November 2014
- 1 – 4 December 2014
INVESTATION PRICE/PERSON :
- Rp 8.500.000/person (full fare) or
- Rp 8.250.000/person (early bird, payment 1 week before training) or
- Rp 7.950.000/person (if there are 3 or more participants from the same company)
FACILITIES FOR PARTICIPANTS:
- Training Module
- Flash Disk contains training material
- Certificate
- Stationeries: NoteBook and Ballpoint
- T-Shirt
- Backpack
- Training Photo
- Training room with Full AC facilities and multimedia
- Lunch and twice coffeebreak every day of training
- Qualified Instructor
- Transportation for participants from hotel of participants to/from hotel of training – VV (if minimal participants is 4 persons from the same company)
Drilling Operation for Nondrilling Personnel