GAS DEHYDRATION AND GLYCOL REGENERATION
EVENT
8 – 10 April 2014 | Rp 7.200.000,- / person at BALI / YOGYAKARTA / BANDUNG
29 April – 2 May 2014 | Rp 7.200.000,- / person at BALI / YOGYAKARTA / BANDUNG
20 – 23 May 2014 | Rp 7.200.000,- / person at BALI / YOGYAKARTA / BANDUNG
3 – 5 June 2014 | Rp 7.200.000,- / person at BALI / YOGYAKARTA / BANDUNG
24 – 27 June 2014 | Rp 7.200.000,- / person at BALI / YOGYAKARTA / BANDUNG
COURSE DESCRIPTION GAS DEHYDRATION AND GLYCOL REGENERATION
The natural gas industry has recognized that dehydration is necessary to ensure smooth operation of gas transmission lines. Dehydration prevents the formation of gas hydrates and reduces corrosion. Unless gases are dehydrated, liquid water may condense in pipelines and accumulate at low points along the line, reducing its flow capacity. Therefore, the removal of the water that is associated with natural gases in vapor form is one critical step in gas processing scheme. Several methods have been developed to dehydrate gases on an industrial scale. The three major methods are: direct cooling, adsorption and absorption. Glycol and methanol injection, glycol dehydration contactor, and glycol regeneration are important issues in gas production operations.
COURSE OUTLINE GAS DEHYDRATION AND GLYCOL REGENERATION
- Overview of the Production of Transportable and Salable Gas
- Legal and Safety Requirements in Gas Fuel Market
- Reservoir Fluid Type and the Hydrocarbon PVT Diagram
- Prevention of Hydrate Formation and the Dehydration Processes
- Hydrate Inhibitor and the Methanol and Glycol Injection
- Injection System and the Low Temperature Separation
- Dehydration in Contactor Column and Glycol Regeneration
- Contactor and Regenerator Plant Operation and Controls
- Glycol Conditioning and Glycol Losses Control
- Plant Maintenance and Troubleshooting
COURSE SCHEDULE GAS DEHYDRATION AND GLYCOL REGENERATION
BALI / YOGYAKARTA / BANDUNG
- 8 – 10 April 2014
- 29 April – 2 May 2014
- 20 – 23 May 2014
- 3 – 5 June 2014
- 24 – 27 June 2014
Price GAS DEHYDRATION AND GLYCOL REGENERATION
- Rp 7.200.000,- / person (Non Residential)
- Rp 8.500.000,- / person (Residential)
GAS DEHYDRATION AND GLYCOL REGENERATION