HAZARD IDENTIFICATION (HAZID)
Acara
17 – 20 September 2018 | Rp. 7.950.000/ peserta di Bandung
29 Oktober – 01 November 2018 | Rp. 7.950.000/ peserta di Bandung
19 – 22 November 2018 | Rp. 7.950.000/ peserta di Bandung
17 – 20 Desember 2018 | Rp. 7.950.000/ peserta di Bandung
INTRODUCTION HAZARD IDENTIFICATION (HAZID)
Hydrocarbon processing industry is categorized as a high risk industry due to the hazards containing either in the material processed or the operations used in its facilities. Because of its vulnerability, a simple event, either man-made or natural one may lead to significant disasters. Flixborough, Bhopal and Piper Alpha disasters are three classic examples of major accident causing serious loss of life and/or property. A deep understanding on safety-related aspects of the materials and processes or operations implemented in hydrocarbon facilities is therefore critical to operate this kind of industry in safe manner and preventing it to go wrong. Hazard identification ‘the identification of undesired events that lead to materialization of a hazard, the analysis of the mechanisms by which these undesired events could occur and usually estimation of the extent, magnitude and likelihood of any harmful effects’ This short course is intended to give understanding on HSE problems and several methods of Hazard Identification (HAZID).
WHO SHOULD ATTEND
- Process Engineers
- Instrument Engineers
- Material Engineers
- Structure Engineers
- Electrical Engineers
- Mechanical Engineers
- Safety and Environment Engineers
MATERIAL OUTLINE HAZARD IDENTIFICATION (HAZID)
- HSE Problem and Sources of Hazard
- Preview of Several Method of HAZID
- Check List
- ‘What If’ Analysis
- PHR (Process Hazard Review)
- ETA (Event Tree Analysis)
- FTA (Fault Trees Analysis)
- FMEA (Failure Mode and Effect Analysis)
- ETA (Event Tree Analysis)
- Introduction to method of ETA
- Objectives
- Procedure
- Application
- Case Study
- Introduction to method of ETA
- FTA (Fault Tree Analysis)
- Introduction to method of ETA
- Objectives
- Procedure
- Application
- Case Study
- Introduction to method of ETA
- FMEA (Failure Mode and Effect Analysis)
- Introduction to method of FMEA
- Limitations of FMEA
- Procedure for FMEA
- FMEA worksheets
- Criticality analysis
- Functional and Hardware FMEA/FMECA examples
- Multi-criteria Pareto ranking
- Common cause screening
- Matrix method
- Risk priority number method of FMECA
- Fuzzy logic prioritization of failures
- Generic part count
- Case Study
INSTRUCTOR
Dr.Eng.Ir. Azis Trianto,M.Sc. dilahirkan di Pekalongan 1 Februari 1969, Posisi akademik beliau sekarang sebagai Assistant Professor pada departemen Teknik Kimia ITB. Beliau menamatkan Sarjana di Departemen Teknik Kimia ITB, Masternya dari Departemen Kimia Tokyo Institute of Technology Jepang, Doktor diambilnya dari deapartemen Teknik Kimia Tokyo University of Agriculture and Technology Jepang, dan beliau juga sempat mengambil Post Doctoralnya di Japan society for promotion of science fellow, Departemen Teknik Kimia Tokyo University of Agriculture and Technology Jepang. Dari tahun 2008 sampai sekarang beliau adalah ketua Graduate Program pada Departemen Teknik Kimia ITB. Di kampusnya beliau mengasuh mata kuliah termodinamika, material & energy balance, chemical reaction engineering, utility system, separation process, chemical process safety & chemical process design. Beberapa penelitian beliau, diantaranya hydrogen recovery from off-gas, propylene synthesis by propane dehydrogenation, synthesis of higher hydrocarbons from methane, gas separation using membrane, and L-Lactic Acid separation. Pada tahun 1997 – 2002 beliau sebagai Research Associate pada Center for Research Energy ITB. Pada tahun 1993 – 1994 beliau juga sebagai Research Associate pada Development Technology Center ITB. Beliau telah mengeluarkan banyak papers, mengikuti conferences dan mempunyai beberapa paten diantaranya “Catalytic reactor with porous membrane partition wall, manufacture of chemical substances using same, and reaction apparatus using same,” dan “Metode dan Alat Pengukur Permeabilitas Gas melalui Membran Berpori”. Beliau juga melakukan beberapa tugas, diantaranya “Development of Prototype of a Pilot Two-Stage Domestic Waste Treatment Unit”, “Monitoring on the Release of Hazardous Metal Ions from Battery and Electroplating Industries to Aquifer,”, “Study on CO2 Emission in Industrial Sector in Indonesia,”, “Update on General Specification of PT Badak”. Dr.Eng.Ir. Azis Trianto,M.Sc. sudah sering mengajar training ke banyak perusahaan di Indonesia, untuk topik-topik di bidang kompetensinya seperti QRA and RBI Methodology, Quantitative Risk Assessment, Natural Gas Processing and Process Control, Natural Gas Processing, Occupational Safety and Health, Piping Simulation, Laboratory Management, Gas Processing and equipment, dan lain-lain.
VENUE
Hotel Kagum Group Bandung
(Golden Flower, Banana Inn, Grand Seriti, Carrcadin, Amaroossa, Grand Serela, Gino Feruci, Verona Palace, Malaka, Zodiac Taurus)
TRAINING DURATION
4 days
- 17 Sep 2018-20 Sep 2018
- 29 Oct 2018-01 Nov 2018
- 19 Nov 2018-22 Nov 2018
- 17 Dec 2018-20 Dec 2018
INVESTMENT PRICE/PERSON :
- Rp. 7.950.000/person (full fare) or
- Rp. 7.750.000/person (early bird, payment 1 week before training) or
- Rp. 7.500.000/person (if there are 3 persons or more from the same company)
FACILITIES FOR PARTICIPANTS
- Training Module
- Training CD Contains Training Material
- Certificate
- Stationeries: NoteBook and Ballpoint
- Jacket or Waistcoat or T-Shirt
- Bag or Backpackers
- Training Photo
- Training Room with Full AC Facilities and multimedia
- Once lunch and twice coffeebreak every day of training
- Qualified instructor
- Transportation for participants from hotel of participants to/from venue of training(if minimal number of participants from one company is 4 persons)