HAZARD IDENTIFICATON (HAZID)
ACARA
10 – 13 Februari 2020 | Rp 8.500.000/ peserta di Bandung
16 – 19 Maret 2020 | Rp 8.500.000/ peserta di Bandung
30 Maret – 02 April 2020 | Rp 8.500.000/ peserta di Bandung
Jadwal Training 2020 Selanjutnya …
HAZARD IDENTIFICATON TRAINING INTRODUCTION
Hydrocarbon processing industry is categorized as a high risk industry due to the hazards containing either in the material processed or the operations used in its facilities. Because of its vulnerability, a simple event, either man-made or natural one may lead to significant disasters. Flixborough, Bhopal and Piper Alpha disasters are three classic examples of major accident causing serious loss of life and/or property. A deep understanding on safety-related aspects of the materials and processes or operations implemented in hydrocarbon facilities is therefore critical to operate this kind of industry in safe manner and preventing it to go wrong. Hazard identification is ‘the identification of undesired events that lead to materialization of a hazard, the analysis of the mechanisms by which these undesired events could occur and usually estimation of the extent, magnitude and likelihood of any harmful effects’ This short course is intended to give understanding on HSE problems and several methods of Hazard Identification (HAZID).
WHO SHOULD ATTEND THIS HAZARD IDENTIFICATON TRAINING ?
- Process Engineers
- Instrument Engineers
- Material Engineers
- Structure Engineers
- Electrical Engineers
- Mechanical Engineers
- Safety and Environment Engineers
HAZARD IDENTIFICATON TRAINING MATERIAL OUTLINE
- HSE Problem and Sources of Hazard
- Preview of Several Method of HAZID
- Check List
- ‘What If’ Analysis
- PHR (Process Hazard Review)
- ETA (Event Tree Analysis)
- FTA (Fault Trees Analysis)
- FMEA (Failure Mode and Effect Analysis)
- ETA (Event Tree Analysis)
- Introduction to method of ETA
- Objectives
- Procedure
- Application
- Case Study :
- FTA (Fault Tree Analysis)
- Introduction to method of ETA
- Objectives
- Procedure
- Application
- Case Study :
- FMEA (Failure Mode and Effect Analysis)
- Introduction to method of FMEA
- Limitations of FMEA
- Procedure for FMEA
- FMEA worksheets
- Criticality analysis
- Functional and Hardware FMEA/FMECA examples
- Multi-criteria Pareto ranking
- Common cause screening
- Matrix method
- Risk priority number method of FMECA
- Fuzzy logic prioritization of failures
- Generic part count
- Case Study
INSTRUCTOR : Ir. In Jumanda Kasdadi, MT. and Team
VENUE : Bandung (Golden Flower, Banana Inn, Serela, Gino Feruci), Amaroossa Hotel, Noor Hotel, Grand Setiabudi Hotel, dll
TRAINING DURATION : 4 days
- 10 Feb 2020-13 Feb 2020
- 16 Mar 2020-19 Mar 2020
- 30 Mar 2020-02 Apr 2020
- 05 Mei 2020-08 Mei 2020
- 08 Jun 2020-11 Jun 2020
- 29 Jun 2020-02 Jul 2020
- 10 Agust 2020-13 Agust 2020
- 31 Agust 2020-03 Sep 2020
- 12 Okt 2020-15 Okt 2020
- 09 Nop 2020-12 Nop 2020
- 30 Nop 2020-03 Des 2020
INVESTMENT PRICE/PERSON :
- Rp. 8.500.000/person (full fare) or
- Rp. 8.250.000/person (early bird, payment 1 week before training) or
- Rp. 7.950.000/person (if there are 3 persons or more from the same company)
FACILITIES FOR PARTICIPANTS :
- Training Module
- Flash Disk contains training material
- Certificate
- Stationeries: NoteBook and Ballpoint
- T-Shirt
- Backpack
- Training Photo
- Training room with full AC facilities and multimedia
- Lunch and twice coffeebreak everyday of training
- Qualified instructor
- Transportation for participants from hotel of participants to/from hotel of training (if minimal number of participants from one company is 4 persons)
HAZID (HAZARD IDENTIFICATON)