Butuh Training?

Silakan ketik kebutuhan training Anda di sini. Ada lebih 15.000 topik dan 250.000 event sepanjang tahun 2025

PERMIT TO WORK SYSTEMS AND METHOD STATEMENTS

EVENT

22 – 23 January 2015 | Rp. 3.950.000/peserta at Bandung
16 – 17 February 2015 | Rp. 3.950.000/peserta at Bandung
19 – 20 March 2015 | Rp. 3.950.000/peserta at Bandung
08 – 09 April 2015 | Rp. 3.950.000/peserta at Bandung
Jadwal Training 2015 Selanjutnya …

 

TRAINING INTRODUCTION PERMIT TO WORK SYSTEM AND METHOD STATEMENTS

Permit to work are used to control high risk work activities, such as hot work, work at height, confined spaces work etc. Method statements are used in many industries, again as a control measure to detail the correct and safe sequence for work operation.

TRAINING OBJECTIVES PERMIT TO WORK SYSTEM AND METHOD STATEMENTS

The purpose of this training  is to help in determining if a job requires a work permit due to ESS&H hazards, system complexities, or work coordination needs.  If the job already has an established work procedure or has been reviewed and defined as “Worker Planned” work due to the training and qualifications of the crafts person or technician, then the checklist is not needed.

WHO SHOULD ATTEND THIS TRAINING?:

Anyone who uses or issues permits to work and anyone who produces or used method statements.

OUTLINE DEVELOPING PERMIT TO WORK SYSTEMS AND METHOD STATEMENTS :

  1. Overview of safe systems of work
    1. Human Engineering
    2. Machine and Tools guarding
    3.  Behavioral factors
  2. The purpose of permits and method statements
    1. ESS&H or Other Permits Needed
    2. Safety, Security and Facility Concerns
    3. Environmental/Waste Concerns
    4. Radiation Issues
    5. Complexity/Uncertainty Issues
    6. Work Coordination
  3. Permit to work systems
  4. Use of the documents in practice
  5. Document templates will be provided to all delegates during the course.

Instruktur Training PERMIT TO WORK SYSTEM AND METHOD STATEMENTS

Bambang Pamudji BSc.SE

Bambang Pamudji, B.Sc.,SE. has much real experiences, he is former Senior Health and Safety staff at PT. Pupuk Sriwidjaja,PUSRI(Urea Fertilizer Manufacturer) Palembang. He was born in Pasuruan East Java, 14 March 1950. He got his B.Sc in Public Health from APK Surabaya in 1971 and was graduated from Economic Management Sriwidjaja University, UNSRI, Palembang in 1996. He has certificates in Health, Safety, and Environment (HSE) from Depnakertrans RI/Institutions and Universities in Indonesia, institutions and Universities in UK, and National Safety Council. Experienced in setting up Health and Safety Management System documentation and its application. Experienced internal lead auditor SMK3 in PT. Pupuk Sriwidjaja, and External lead auditor SMK3 for Indonesian Association Fertilizer Producer. He has been teaching industrial training classes for many classes related to topics of his competencies, HSE. Many participants from many companies in Indonesia have participated in his training classes.

VENUE :  

Bandung (Golden Flower, Banana Inn, Grand Seriti, Carrcadin, Amaroossa, Grand Serela, Gino Feruci, Verona Palace, Malaka, Zodiac Taurus)

TRAINING DURATION PERMIT TO WORK SYSTEM AND METHOD STATEMENTS

2 days

 

 

TRAINING TIME PERMIT TO WORK SYSTEM AND METHOD STATEMENTS

  1. 22 Jan 2015-23 Jan 2015
  2. 16 Feb 2015-17 Feb 2015
  3. 19 Mar 2015-20 Mar 2015
  4. 08 Apr 2015-09 Apr 2015
  5. 12 May 2015-13 May 2015
  6. 18 Jun 2015-19 Jun 2015
  7. 27 Jul 2015-28 Jul 2015
  8. 19 Aug 2015-20 Aug 2015
  9. 17 Sep 2015-18 Sep 2015
  10. 12 Oct 2015-13 Oct 2015
  11. 19 Nov 2015-20 Nov 2015
  12. 29 Dec 2014-30 Dec 2014

 

 

INVESTMENT PRICE/PERSON :

  1. 3.950.000/person (full fare) or
  2. 3.750.000/person (early bird, payment 1 week before training) or
  3. 3.500.000/person (if there are 3 persons or more from the same company)

 

 

FACILITIES FOR PARTICIPANTS :

  1. Training Module
  2. Flashdisk contain training material
  3. Certificate
  4. NoteBook and Ballpoint
  5. T-Shirt
  6. Backpack
  7. Training Foto
  8. Training room with full ac facilities and multimedia
  9. Lunch and twice coffee break everyday of training
  10. Qualified Instructor
  11.  Transportation from hotel of participants to hotel of training VV (if minimal participants from the same company is 4 )

DEVELOPING PERMIT TO WORK SYSTEMS AND METHOD STATEMENTS

 

Formulir Pra-Pendaftaran Public Training / Permintaan Informasi Lebih Lanjut
  1. JENIS INFORMASI/TRAINING
  2. (required)
  3. (required)
  4. DATA PRIBADI
  5. (required)
  6. (required)
  7. (required)
  8. (valid email required)
  9. (required)
  10. (required)
  11. DATA PRE REGISTRATION (Tidak Mengikat)
  12. (required)
  13. PESAN UNTUK PENYELENGGARA TRAINING
  14. Captcha
 

cforms contact form by delicious:days

Tags:  , ,