WELLHEAD INSTRUMENTATION AND HYDRAULIC CONTROL SYSTEMS
EVENT
16 – 19 April 2020 | Rp 8.750.000/ peserta di Bandung
06 – 09 Mei 2020 | Rp 8.750.000/ peserta di Bandung
12 – 15 Juni 2020 | Rp 8.750.000/ peserta di Bandung
Jadwal Training 2020 Selanjutnya …
TRAINING INTRODUCTION
A wellhead is a general term used to describe the component at the surface of an oil or gas well that provides the structural and pressure-containing interface for the drilling and production equipment. The primary purpose of a wellhead is to provide the suspension point and pressure seals for the casing strings that run from the bottom of the hole sections to the surface pressure control equipment. Once the well has been drilled, it is completed to provide an interface with the reservoir rock and a tubular conduit for the well fluids. The surface pressure control is provided by a christmas tree, which is installed on top of the wellhead, with isolation valves and choke equipment to control the flow of well fluids during production.
TRAINING OBJECTIVE
You will be able to:
- Understand the well activities
- Understand the concept of wellhead
- Understand the instrumentation and control
- Know the instrumentation and control
- Understand the hazardous area at wellhead
- Understand the valves and choke valves
- Understand the safety marking of instrumentation
- Understand the schematic diagram
- Understand the specification break in P&ID
- Know the control systems
WELLHEAD INSTRUMENTATION AND HYDRAULIC CONTROL SYSTEMS TRAINNIG OUTLINE
- General principles
- Pressure Concepts
- Causes and Warning Signs of Kicks
- Shut-in Procedures and Shut-in Pressure
- Specification equipment for pressure
- Circulation and Well Control
- Formation Fracture Gradient
- Well-Control Methods
- Unusual Well-Control Operations
- Well Control for Completion and Workover
- Well Control and Floating Drilling Rigs
- Blowout Prevention Equipment
- Wellhead Equipment
- Valves and Chokes
- Specification Break
- Wellhead Control Systems
- Hazardous Classification Area
- Instrumentation Marking and Classification
- Well safety systems
CLASSROOM/DEMONSTRATION/LABORATORY EXERCISE
- Study Case
- Simulation
PREREQUISITE: Have Knowledge on PLC
INSTRUCTOR
Ir.Endra Joelianto, Ph.D
Ir.Endra Joelianto, Ph.D. is an expert in control engineering and industrial automation. His outstanding research is: Hybrid Control Systems, Discrete Event Control Systems, Petri Nets Analysis and Application on PLC, Robust and Advanced PID Controller and its implementation on PLC, DCS, Fieldbus, Industrial automation and Advanced Control System Designs. He received first degree (Ir.) in Engineering Physics in 1990 from Department of Engineering Physics, ITB and Doctor of Philosofy (PhD.) in Control Engineering in 2001 from Department of Engineering, The Australian National University, Canberra, Australia. He is Head of Intelligent Control and Automation Laboratory and Coordinator of PLC Research Group for research and training, Engineering Physics Study Program and Instrumentation and Control Research Division, Institut Teknologi Bandung. He was Director of Schneider-OMRON PLC Training Center, Maranatha Christian University, Bandung. He has attended several professional training on PLC, DCS and Instruments Callibration, such as: Yokogawa DCS, Bandung (2000), Implementation of Indonesian National Standard (SNI) 19-17025 and Basic Calibration, Yokogawa Electric Corporation, Bandung (2001), Fieldbus Foundation Technology, Singapore (2002), Basic and Advanced PLC Telemecanique-TWIDO, Bandung (2003), Basic and Advanced PLC OMRON, Jakarta (2004), Cleaner Production Application in Industries (Bandung 2005), Effective Energy Systems for Sustainable Development (Thailand 2006), Programming and Networking PLC Mitsubishi (2006), InTouch Wonderware, Wonderware Historian and Information Server (Bandung, 2012). He also has hosted Workshop on Industrial Automation (Bandung, 2002) and (Bandung, 2003), Workshop on Application of PLC in Industrial Automation (Bandung, 2003), National Workshop on Instrumentation & Control (2011) and many professional trainings on PLC, DCS, SCADA, Human Machine Interface and Industrial Process Control and Automation in Bandung. He was the project leader of Department of National Education TPSDP Retooling Program Batch II on Industrial Automation using PLC (2004). He is the chairman of National Student Competition on PLC Programming held regularly since 2007 in ITB. He serves as instructor either for public or for in-house training on instrumentation and process control to universities, industries, petrochemical or oil and gas companies, such as: PT. NGL Arun, PT. NGL Bontang, PT. Pupuk Iskandar Muda, PT. Pupuk Kalimantan Timur, PT. Pupuk Kujang, PT. Semen Padang, PT. Semen Gresik, PT. Semen Cibinong, PT. Indocement, PT. Semen Tigaroda Perkasa, PT. Exspan Nusantara, PERTAMINA, British Petroleoum, Maxus, Gulf, PT. Chevron Geothermal, PT. Chevron Pacific Indonesia)
VENUE
Bandung (Golden Flower, Banana Inn, Serela, Gino Feruci), Amaroossa Hotel, Noor Hotel, Grand Setiabudi Hotel, dll
TRAINING DURATION
4 days
- 16 Mar 2020-19 Mar 2020
- 06 Apr 2020-09 Apr 2020
- 12 Mei 2020-15 Mei 2020
- 02 Jun 2020-05 Jun 2020
- 13 Jul 2020-16 Jul 2020
- 03 Agust 2020-06 Agust 2020
- 14 Sep 2020-17 Sep 2020
- 05 Okt 2020-08 Okt 2020
- 02 Nop 2020-05 Nop 2020
- 14 Des 2020-17 Des 2020
INVESTATION PRICE/PERSON
- Rp 8.750.000/person (full fare) or
- Rp 8.500.000/person (early bird, payment 1 week before training) or
- Rp 8.250.000/person (if there are 3 or more participants from the same company)
FACILITIES FOR PARTICIPANTS
- Training Module
- Flashdisk contain training material
- Certificate
- NoteBook and Ballpoint
- T-Shirt
- Backpack
- Training Foto
- Training room with full ac facilities and multimedia
- Lunch and twice coffee break everyday of training
- Qualified Instructor
- Transportation from hotel of participants to hotel of training VV (if minimal participants from the same company is 4 )
WELLHEAD INSTRUMENTATION AND HYDRAULIC CONTROL SYSTEMS